In todays lesson, each member of the group have worked well, and communication has increased dramatically which I am very pleased with, because it meant that the working atmosphere was made much more positive which meant every one was relaxed and the work was easier to produce within the lesson, and due to the deadline being tonight (7pm) that it was even better that the group worked well today.

My personal work achieved within todays lesson, was that I organized everyone in the group and made sure that the all knew what was going on with the project so far. After everyone in the group was organized and informed about what needed doing, then I set each individual their tasks for the session. The work that was produced within todays lesson / the tasks which were completed are shown below:
  • Place posters online to advertise the airing of the 1st episode (Tara) - Completed
    Edit the photo for the poster, and also create credit reel (Tim) - Completed
  • Edit the footage of the 1st episode and get it ready to be put online tonight at 7pm (Matt) - Completed

Shown in this photo is Matt (editing the 1st episode ) and Tara (putting posters online)



In this photo you can see Tim, who is updating facebook, and creating a facebook group ready for when the 1st episode is uploaded at 7pm tonight

  • Create a CD Films Ident to be placed onto each episode (Dave) - Completed
  • Create story boards for the 2nd episode (Alie) - Completed
Shown in this photo is Alie who is completeing the storyboards for the 2nd episode




  • Organize the shot lists, and finish them off for Alie to create the story boards (Ash) - Completed
  • Sort out some music from the chosen bands we found to be placed in the middle of the 1st episodes (Sam) - Completed
Shown below is a photo showing Ash & Sam. Ash is working on the shotlist for episode 2 and Sam is working on the other sound tracks to use for the 1st episode, (to be placed in the middle of the video, during the 'action' scenes) Ash is also giving Sam feedback on his chosen songs


  • Make an animatic for the 1st episode storyboard (Sam & Mike) - Not completed
  • Research into other websites where we can upload the 1st episode (Mike) - Complete
Shown below is a photo of Mike who is researching into other webpages where we can upload the video (1st episode) onto


  • Contact the crew / cast and ensure that everything is ok for monday (Mike) - Completed
  • Put progress report onto each individual blog (everyone in group) - In progress (weekend)
The tasks which were not completed in lesson today will be set for each individual to do over the weekend or complete next week, but as far as the progress so far, I am pleased with the work load produced today , By each person in the group, including myself.